Статья
2008
On Project Scheduling Problem
A.A. Lazarev, E.R. Gafarov · Automation and Remote Control, 69 (12), 2070-2087
Описание публикации
Consideration was given to the resource-constrained project scheduling problem and its special cases. The existing lower estimates of the objective function—minimization of the project time—were compared. It was hypothesized that the optimal value of the objective
function of the nonpreemptive resource-constrained project scheduling problem is at most twice as great as that of the objective function with preemption. The hypothesis was proved for the cases of parallel machines and no precedence relation.
A.A. Lazarev and E.R. Gafarov (2008), On Project Scheduling Problem. Automation and Remote Control, 69 (12), 2070-2087 (journal impact factor 2018: 0.589). Q2
Другие статьи
2022
On lower and upper bounds for single machine parallel batch scheduling subject to chains of jobs
E.R. Gafarov, A. Dolgui
Optimization Letters
2020
Minimizing Total Weighted Tardiness for Scheduling Equal-Length Jobs on a Single Machine
E.R. Gafarov, A.A. Lazarev, F. Werner
Automation and Remote Control Volume 81, Issue 5, 853-868
2019
Can a Branch and Bound algorithm solve all instances of SALBP-1 efficiently
A. Dolgui, E. Gafarov
IFAC-PapersOnLine, Volume 52, Issue 13. 2788-2791